After-sales Service: | More Than 5 Years |
---|---|
Install: | Support Installation |
Mobility: | Adjustable |
Still deciding? Get samples of US$ 20/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specifications:
|
|
main steel frame
|
H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe
|
Secondary frame
|
hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc.
|
Roof panel
|
EPS sandwich panel,glass fiber sandwich panel,rock wool sandwich panel,and PU sandwich panel or steel sheet
|
Wall panel
|
Sandwich Panel or Corrugated Steel Sheet
|
Tie Rod
|
Circular Steel Tube
|
Brace
|
Round Bar
|
Knee Brace
|
Angle Steel
|
Drawings & Quotation:
|
|
(1) Customized design is welcomed.
|
|
(2) In order to give you an exactly quotation and drawings, please let us know the length, width, eave height and local weather. We will quote for you promptly.
|
Why choose steel structure?
1. Short construction period: Compared with the traditional concrete structure, the construction period
for steel structure is about 1/3 shorter than the traditional concrete structure.
2. Improve investment efficiency: Short construction period can reduce the pressure of capital occupation,
reduce the risk of market change, and improve the investment efficiency of steel structure.
3. Reduce foundation cost: The requirement of steel structure on foundation load is reduced, which
can greatly reduce foundation cost and civil foundation cost.
Compared with traditional buildings, steel structure building is a new building structure- the entire building
made of steel. The structure mainly comprises steel beams, columns, trusses, and other parts made of
section steel and steel plates. It is connected between parts and parts by welding, bolts, and rivets.
Shandong Hongtian Heavy Industries Co., Ltd. was established in 2001,Our group owns the international
market department, the domestic market department, the R&D department and tow group modemized
Processing Center,the production plant covering 230000 square meters.The company has 380 employees,
50 senior engineers and a professional design team.
Products covering light steel structure, heavy steel structures, assembled concrete residential, light steel
villas, container hoses,glass curain wall, poultry house, and other green bilding maerials Atpresent, our
products have been exported to more than 80 countries in the world, and have been widely recognized.
Hongyue Group passed ISO9001:2008 quality management system certification and ISO14001:2004
environmental management system certification. We have established a perfect safety assurance system.
We have CNC cutting machines, CNC shearing machines, Hydraulic sheet metal blending machines,
Submerged arc welding machines, Corrugated sheet molding machines, Shot blasting cleaning machines,
Punching machines, Air compressors, Drilling Machines, Forging Machines and H-beam assembly lines.
Production mechanization and equipment automation reach the advanced level in the industry.
Hongyue Group has 38 engineers and 26 R&D staff members. We have independent research and
development centers. Our company has established long-term technical cooperation with Zhejiang
University, Tianjin University, China's Academy of Building Research and Shandong Architecture University.
Steel components are packaged with iron pallets at the factory with the coding number, which is
convenient for customers to unload; small steel structures are bundled with iron wires and hung with tags.
Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must
In order to ensure the accurate quotation, pls provide below info before quotation,
thanks!
1 Location (where will be built? ) which country? which city?
2 Size: Length*width* Eave height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height) _____kn/m2, _____mm, temperature range?
5 anti-earthquake _____level
6 Brick wall needed or not If yes, 1.2m high or 1.5m high? or other?
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested;
If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quantity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m